RecreationandParkCommission | 2006-11-08 | 4 | Director Lillard stated that the user groups asked that the construction not begin until June 2007. Staff has agreed to their request. M/S/C REEVES/KAHUANUI (unanimously approved) "That the conceptual plan (Option B) be approved." Approved (6): Ogden, Kahuanui, Cooper, Ingram, Johnson, Reeves Commission Cooper asked what would be done about the gophers in the park. Director Lillard stated that there is a wire mesh that will be laid down before the sod is installed to help with the situation. 7. UNFINISHED BUSINESS A. Status Report on Veteran's Building - (Discussion Item) Commissioner Ingram introduced Dick Rutter, A. Rule Designs Principal Architect, and Annie Rutter, A. Rule Designs Design Principal, to the Commission. They have been working on a Remodel Project Priority Matrix for the Veteran's Building with staff and the Commission to assist in performing improvements/renovations to the building. Director Lillard thanked Mr. and Mrs. Rutter for all of their hard work. Dick and Ann presented the matrix to the Commission for their perusal. The Matrix included: Remodel Projects Priority Matrix for the Veteran's Building located at 2203 Central Avenue in Alameda, California. A priority list of remodel projects as discuss on a building tour on March 28, 2006. Floor Plans of the existing conditions of the Veteran's Building keyed to the Matrix. Kitchen Remodel Worksheet. Bathroom Remodel Worksheet. The Matrix included cost estimates for potential projects, such as the renovation of the downstairs kitchen and banquet rooms, upgrades to the main floor auditorium and improvements to the stage. Listed below is a summary of the estimated costs for the identified projects: Kitchen $525,000 Banquet Room $150,000 Auditorium $125,000 Stage $ 40,000 $840,000 The above figures do not include estimates for project management, inspections, permits, or contingencies. All costs for completing the identified projects are between $1.5 and $2 - 4 - Recreation & Park Commission Mtg Minutes Wednesday, November 8, 2006 | RecreationandParkCommission/2006-11-08.pdf |