HistoricalAdvisoryBoard | 2019-09-05 | 6 | Board Member Jones felt the sliding doors were different enough in scale and materials that it did not appear to be trying to replicate the historic look. Board Members Lau and Wit said they were okay with the sliding doors. Staff Member Tai continued to summarize the Board position. Sliding doors would be okay on all sides of Building 19. The removed doors on Building 27 should leave some evidence of their previous existence, if feasible. The one story gatehouse option would be preferred. Building 15, 17 and 18 would remove the water table and restore the monitor windows. There would be a report back to the Board on the findings regarding moving and relocation of buildings, and reporting back on the disposition and demolition of materials. Chair Saxby made a motion to approve the draft resolution with all of the conditions summarized by Staff Member Tai. Board Member Wit seconded the motion. The motion passed 4-0. 7-B 2019-7226 PLN19-0270 - Informational Presentation on Alameda Marina Phase 1 - 1815 Clement Avenue, Alameda Marina - Applicant: Pacific Shops, Inc. The Historical Advisory Board will hear a presentation on Phase 1 of the Alameda Marina Master Plan project, called Wrap A or The Launch. The Board may provide comments on the project design but no action will be taken. This item is informational only and no environmental review is required under the California Environmental Quality Act (CEQA) Staff Member Tai introduced the item. The staff report and attachments can be found at: https://alameda.legistar.com/LegislationDetail.aspx?ID=4120016&GUID=9F983014- 886B-4B8D-BDOE-52F3F36D2323&FullText=1 Mr. Fry gave a brief presentation on the design for the first multifamily building at Alameda Marina. Chair Saxby asked for more information about the phasing of the project. Mr. Murphy said that this 351 unit building, combined with the maritime commercial core would be phase I. He said phase Il is on the eastern edge of the site. He said the historic rehab would be happening simultaneously with the apartment construction. He said the seawall in front of each phase would be done at the same time, which would allow upgrading utilities for the marina. 8. BOARD COMMUNICATIONS *None* 9. STAFF COMMUNICATIONS Approved Meeting Minutes Page 6 of 7 September 5, 2019 | HistoricalAdvisoryBoard/2019-09-05.pdf |