pages: GolfCommission/2022-04-12.pdf, 2
This data as json
body | date | page | text | path |
---|---|---|---|---|
GolfCommission | 2022-04-12 | 2 | Tracy Craig of Greenway Golf gave a timeline of when the fire tower was vacated and when Greenway approached the City regarding renovation as well as a timeline of how the project has progressed with the City regarding amendments of the lease. Zac Wald of Greenway Golf explained that the Design Review Committee is a subset of the Planning Board. He was brought on board with Greenway to coordinate this project. The designer for this project is April Phillips, who designed the newest Alameda waterfront park. Mr. Wald explained that Greenway hired engineers to make sure the building was sustainable, and it was determined that the building is structurally sound. The renovation is planned to be done by Fall 2022. Mr. Wald proceeded through the Beautification Plan which was attached to the agenda. Commissioner Lattimore asked if there was a plan for the interior, and Mr. Wald answered not at this time. Commissioner Loud asked if the existing wall on Island Drive is remaining and if the existing fence still remaining on the second hole side. Mr. Wald stated that the existing wall will remain and will be painted on the Greenway side but will not on the roadway side and the fence will be cleaned up and will later determine if the fence might be removed depending on several factors. Commissioner Loud then asked if the gardens will be open to the patrons of the golf course as well as the general public and Mr. Wald stated that has not been evaluated as yet. Ms. Craig added that is what type of input they are looking for. Mr. Patel added that this a beautification project and the intention is not opening it to the general public but may occasionally open it for a community gathering. Commissioner Loud asked if the garden was going to be irrigated with potable or non- potable, and Mr. Patel responded that it will be non-potable, following the path the golf course already uses. Chair Downing asked if the artwork on the windows will be on the inside or the outside, and Mr. Wald explained that it would be on the inside. Chair Downing then asked what the asphalt will be covered with, and Mr. Wald stated that it would be decomposed granite that is compacted and on top of that, would be raised planters. Chair Downing asked what the cost of the project would be, and Mr. Wald stated that he did not know. Chair Downing shared his concern regarding this as construction on the north course has stopped. Mr. Patel stated that the two projects are not connected. Greenway plans to complete this project on time. Amy Wooldridge stated that the next step for their recommendations would be brought to the Planning Board, which is scheduled for May 9, 2022, for review by the public 2 Golf Commission Minutes - Tuesday, April 12, 2022 | GolfCommission/2022-04-12.pdf |